Photocopies are acceptable provided they are as good a quality as the original. Submittal data shall be presented in a clear, precise and thorough manner. Submittals consisting of marked catalog sheets or shop drawings shall be provided. All materials and equipment used to construct this item shall be submitted to the Engineer for approval prior to ordering the equipment. Materials supplied and/or installed that do not materially comply with these specifications shall be removed, when directed by the Engineer and replaced with materials, which do comply with these specifications, at the sole cost of the Contractor.ĭ. Requirements and payment for trenching and backfilling for the installation of underground conduit and duct banks is covered under Item L-110 “Airport Underground Electrical Duct Banks and Conduits.” EQUIPMENT AND MATERIALS 108-2.1 GENERAL.Ī.Airport lighting equipment and materials covered by Federal Aviation Administration (FAA) specifications shall be approved under the Airport Lighting Equipment Certification Program described in Advisory Circular (AC) 150/5345-53, current version.ī.All other equipment and materials covered by other referenced specifications shall be subject to acceptance through manufacturer’s certification of compliance with the applicable specification, when requested by the Engineer.Ĭ.Manufacturer’s certifications shall not relieve the Contractor of the Contractor’s responsibility to provide materials in accordance with these specifications and acceptable to the Engineer. This item shall not include the installation of duct banks or conduit, trenching and backfilling for duct banks or conduit, or furnishing or installation of any cable for FAA facilities. Also included are the installation of counterpoise wires, ground wires, ground rods and connections, cable splicing, cable marking, cable testing, and all incidentals necessary to place the cable in operating condition as a completed unit to the satisfaction of the Engineer. It includes excavation and backfill of trench for direct-buried cables only. It actually makes us look good, that the contractor can only find one thing we've "overdesigned" and it doesn't amount to anything.Item L-108 Underground Power Cable for Airports DESCRIPTIONġ08-1.1 This item shall consist of furnishing and installing power cables direct buried and furnishing and/or installing power cables within conduit or duct banks in accordance with these specifications at the locations shown on the plans. So we laugh, and say put it in per design. So we have them quantify the amount the owner will save, and it invariably comes out to $5000 or $10,000. Side note: Whenever we have a VE (Value Engineering) phase on a project, the first thing the contractor wants to eliminate is duct bank reinforcing. There's no real design, but I have used the reinforcing to span the duct bank over a temporary trench. They're reinforced with #4's around the perimeter at 12 inch spacing and #4 ties at 24 inch centers. There's a lot of casual concrete (waste concrete, thrust blocks, foundation extensions, etc.), but if the backhoe operator sees red, he's been warned. There's a lot of reasons that don't hold up to close examination, but bottom line is, that if you're in a water or wastewater treatment facility, you're likely to be digging a trench through it or a hole into it. ![]() ![]() We reinforce electrical duct banks and require them to be red.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |